|
The BAE Filton 7 acre
building was re-roofed, while RAF and USAF combat aircraft were
being maintained at shop floor level.
NSS erected mobile access rigs
off the spanning tracking at a 20m level to allow the roof work
to proceed.
The system used trackways and
material distribution trollies on the outside of the building,
and a complete waterproof membrane of netting and sheeting.
In the words of BAE, 'not
so much as a cigarette packet fell to ground level'.
|
| --------------------------------------------------------------------------------------------------------- |
|
UK CONTRACTS
- Main Station, Aberdeen
- Queen St Station,
Glasgow
- Lime St, Liverpool
- Main Station, Stoke-on-Trent
- Marylebone
Station, London
- Road Crossing, Deeside
- Manchester 50 Leisure
Centre
- Babcock & Wilcox,
Renfrewshire
- Manchester Airport
- London Heathrow Airport
- St Paul's Cathedral
- Chester Cathedral
- Bovington Tank Factory,
UK
- Naval
Dockyards, Rosyth & Plymouth
- BAE, Filton
- Earls Court 2 Exhibition
Centre, London
- Eden Project Footbridge
|
MIDDLE EAST
SOUTH EAST ASIA
|
|
|
|
|
|
|
 |
| |
| |
MIDDLE
EAST - Khalifa Stadium Doha, Quatar |
|
|
| The
27m span system gave access to the soffitt sheeting, supported
off a tracked tower at the rear of the stand. |
 |
| Read
More » |
|
 |
|
|
 |
| |
| |
SOUTH
EAST ASIA - Chek Lap Kok Airport, Hong Kong |
|
|
| Chek
Lap Kok, the biggest and busiest airport in China, was built
on a man-made island, 10km from Hong Kong. |
 |
| Read
More » |
|
 |
|
|
| |
|