Chester Cathedral wished
to work on the interior roof timbers, while at the same time
as excavating the floor, which contained items of great historical
interest.
NSS installed an access work
place that did not use the floor as its base.
The system comprised of two lines
of tracking 8m above the floor, spanned by bridge panels.
On top of the bridge, NSS erected
the access platform, tailored to the shape of the roof, and tracked
the whole system along the length of the building.
|
| --------------------------------------------------------------------------------------------------------- |
|
UK CONTRACTS
- Main Station, Aberdeen
- Queen St Station,
Glasgow
- Lime St, Liverpool
- Main Station, Stoke-on-Trent
- Marylebone
Station, London
- Road Crossing, Deeside
- Manchester 50 Leisure
Centre
- Babcock & Wilcox,
Renfrewshire
- Manchester Airport
- London Heathrow Airport
- St Paul's Cathedral
- Chester Cathedral
- Bovington Tank Factory,
UK
- Naval
Dockyards, Rosyth & Plymouth
- BAE, Filton
- Earls Court 2 Exhibition
Centre, London
- Eden Project Footbridge
|
MIDDLE EAST
SOUTH EAST ASIA
|
|
|
|
|
|
|
 |
| |
| |
MIDDLE
EAST - Khalifa Stadium Doha, Quatar |
|
|
| The
27m span system gave access to the soffitt sheeting, supported
off a tracked tower at the rear of the stand. |
 |
| Read
More » |
|
 |
|
|
 |
| |
| |
SOUTH
EAST ASIA - Chek Lap Kok Airport, Hong Kong |
|
|
| Chek
Lap Kok, the biggest and busiest airport in China, was built
on a man-made island, 10km from Hong Kong. |
 |
| Read
More » |
|
 |
|
|
| |
|