CONTRACTS

MANCHESTER 50 LEISURE CENTRE POOL
UK

As is normal with swimming pools, the high ceiling required access to install the lighting and ceiling tiles, but the pool prohibited the access system from running on the floor.

NSS fixed a track to the rear balcony, and a second track to the exposed nodes of the roof framework. Using bridge panels, the tracks were spanned over 25m of the Manchester pool, and the access platform was fixed to the curving features of the ceiling.

This mobile rig provided the access required.

---------------------------------------------------------------------------------------------------------

UK CONTRACTS

MIDDLE EAST

SOUTH EAST ASIA

 
 
 
  MIDDLE EAST - Khalifa Stadium Doha, Quatar
 
The 27m span system gave access to the soffitt sheeting, supported off a tracked tower at the rear of the stand.
Read More »
 
  SOUTH EAST ASIA - Chek Lap Kok Airport, Hong Kong
 
Chek Lap Kok, the biggest and busiest airport in China, was built on a man-made island, 10km from Hong Kong.
Read More »
 
Tel: 0845 450 1900
Fax: 0845 450 1901
Email: info@nssgroupplc.com
www.nssgroupplc.com
NSS Group plc, Access House, Aviation Park, Flint Rd, Saltney Ferry, Cheshire. CH4 0GZ.