NSS designed and built
a special access system to enable Marylebone Station to undergo
a complete re-roofing programme while continuing to serve the
30,000 passengers who pass through the station each day.
The interior crash deck was erected
from inside the station, clear of the floor to maintain full
passenger access. The top of the deck was covered with nonslip
waterproof plywood, giving a very clear, safe and gap-proof platform.
To prevent the ingress of rain
water, a mobile steel sheeted roof was erected to one third of
the roof on two tracks, with a 30m clear span.
A 5kN per m2 crash deck was erected
on a side street to store the cladding and roofing materials,
complete with a 2 ton SWL electric hoist, cantilevered 6m over
the pavement into the roadway. This allowed deliveries to be
made during the night without the use of expensive mobile cranes.
|
| --------------------------------------------------------------------------------------------------------- |
|
UK CONTRACTS
- Main Station, Aberdeen
- Queen St Station,
Glasgow
- Lime St, Liverpool
- Main Station, Stoke-on-Trent
- Marylebone
Station, London
- Road Crossing, Deeside
- Manchester 50 Leisure
Centre
- Babcock & Wilcox,
Renfrewshire
- Manchester Airport
- London Heathrow Airport
- St Paul's Cathedral
- Chester Cathedral
- Bovington Tank Factory,
UK
- Naval
Dockyards, Rosyth & Plymouth
- BAE, Filton
- Earls Court 2 Exhibition
Centre, London
- Eden Project Footbridge
|
MIDDLE EAST
SOUTH EAST ASIA
|
|
|
|
|
|
|
 |
| |
| |
MIDDLE
EAST - Khalifa Stadium Doha, Quatar |
|
|
| The
27m span system gave access to the soffitt sheeting, supported
off a tracked tower at the rear of the stand. |
 |
| Read
More » |
|
 |
|
|
 |
| |
| |
SOUTH
EAST ASIA - Chek Lap Kok Airport, Hong Kong |
|
|
| Chek
Lap Kok, the biggest and busiest airport in China, was built
on a man-made island, 10km from Hong Kong. |
 |
| Read
More » |
|
 |
|
|
| |
|