CONTRACTS TING
KAU SUSPENSION BRIDGE
HONG KONG |
|
Ting Kau, the longest
cable-stayed bridge in Asia, was completed in 1997 in time for
the opening of the Chep Lap Kok airport in Hong Kong.
NSS installed a series of 2.5m
wide, 27m span travelling platforms to provide access to the
underside of the bridge for installation of the service duct
work and other ancillary equipment.
Each rig was cantilevered from
the existing tracking 10m to the bridge parapet to allow personnel
access.
|
| --------------------------------------------------------------------------------------------------------- |
|
UK CONTRACTS
- Main Station, Aberdeen
- Queen St Station,
Glasgow
- Lime St, Liverpool
- Main Station, Stoke-on-Trent
- Marylebone
Station, London
- Road Crossing, Deeside
- Manchester 50 Leisure
Centre
- Babcock & Wilcox,
Renfrewshire
- Manchester Airport
- London Heathrow Airport
- St Paul's Cathedral
- Chester Cathedral
- Bovington Tank Factory,
UK
- Naval
Dockyards, Rosyth & Plymouth
- BAE, Filton
- Earls Court 2 Exhibition
Centre, London
- Eden Project Footbridge
|
MIDDLE EAST
SOUTH EAST ASIA
|
|
|
|
|
|
|
 |
| |
| |
MIDDLE
EAST - Khalifa Stadium Doha, Quatar |
|
|
| The
27m span system gave access to the soffitt sheeting, supported
off a tracked tower at the rear of the stand. |
 |
| Read
More » |
|
 |
|
|
 |
| |
| |
SOUTH
EAST ASIA - Chek Lap Kok Airport, Hong Kong |
|
|
| Chek
Lap Kok, the biggest and busiest airport in China, was built
on a man-made island, 10km from Hong Kong. |
 |
| Read
More » |
|
 |
|
|
| |
|